INTRODUCTION TO PHU MY GLOBAL SUPPLY CHAIN ​​CENTER

"Your success is our success."

The Phu My Global Supply Chain Center serves as a strategic hub for the region’s goods collection and transshipment, expected to create strong synergistic value to meet the growing needs of businesses and investors.

0 ha

Industrial park land area

0 ha

Inland Port Scale

0 ha

Scale of Phu My 3 Warehouse

Integrated multimodal infrastructure

PHU MY INLAND PORT

  • Total area: 46 ha
  • Wharf depth: -7 m
  • Total berth length: 600 m
  • Number of berths: 6
  • Capacity: SB vessels & barges 4,500 DWT/ 200 TEUs

PHU MY WAREHOUSE 3

  • Scale: 80,000 m2
  • Warehouse floor area: 54,000 m2
  • Warehouse roof height: 12-19 m
  • Floor load capacity: 5 tons/m2
  • Total storage capacity: 54,000 CBM

CHEMICAL STORAGE AREA

Coming soon

CENTRALIZED WASTEWATER TREATMENT PLANT

Designed and built by Kobelco Eco-Solutions, it is the first wastewater treatment plant in Ba Ria Vung Tau capable of meeting the strictest A-level standards, with a capacity of 45,000 m3/day.

POWER SUPPLY STATION

  • 110KV/22KV -> 22KV to customer fence
  • Total capacity: 378MVA

INDUSTRIAL GAS SUPPLY STATION

  • Supplies: Nitrogen, Oxygen, Hydrogen, Helium, Acetylene, Argon, Carbon dioxide…
  • Capacity: Unlimited, depending on customer needs.

NATURAL GAS SUPPLY STATION

  • Supplying natural gas to customers via underground pipelines to the customer’s factory fence.
  • Capacity: Unlimited.

PHU MY INLAND PORT

  • Total area: 46 ha
  • Wharf depth: -7 m
  • Total berth length: 600 m
  • Number of berths: 6
  • Capacity: SB vessels & barges 4,500 DWT/ 200 TEUs

PHU MY WAREHOUSE 3

  • Scale: 80,000 m2
  • Warehouse floor area: 54,000 m2
  • Warehouse roof height: 12-19 m
  • Floor load capacity: 5 tons/m2
  • Total storage capacity: 54,000 CBM

CHEMICAL STORAGE AREA

Coming soon

CENTRALIZED WASTEWATER TREATMENT PLANT

Designed and built by Kobelco Eco-Solutions, it is the first wastewater treatment plant in Ba Ria Vung Tau capable of meeting the strictest A-level standards, with a capacity of 45,000 m3/day.

POWER SUPPLY STATION

  • 110KV/22KV -> 22KV to customer fence
  • Total capacity: 378MVA

INDUSTRIAL GAS SUPPLY STATION

  • Supplies: Nitrogen, Oxygen, Hydrogen, Helium, Acetylene, Argon, Carbon dioxide…
  • Capacity: Unlimited, depending on customer needs.

NATURAL GAS SUPPLY STATION

  • Supplying natural gas to customers via underground pipelines to the customer’s factory fence.
  • Capacity: Unlimited.

Vision

To become a modern, multimodal logistics hub, leading the global supply chain in the Southeast region, contributing to green and sustainable economic development.

Mission

We provide smart, diverse, cost-effective, and time-efficient logistics solutions, supporting businesses in enhancing their competitiveness and expanding into international markets.

Core values

Reputation - Transparency

"Trust is the foundation of all cooperation."

We act honestly, transparently, and consistently in all our commitments.

Health - Safety - Security

"Safety is the top priority."

We protect people, property, and operations with the highest safety standards.

Standards - Innovation - Creativity

"Standards are the foundation, innovation is the driving force."

We adhere to standards and continuously innovate to make a difference.

Connecting global values

"Standards are the foundation, innovation is the driving force."

We adhere to standards and never

stop innovating to make a difference.

Sustainable development

"Connecting to reach greater heights together."

We collaborate and integrate to spread global values.

Reputation - Transparency

"Trust is the foundation of all cooperation."

We act honestly, transparently, and consistently in all our commitments.

Health - Safety - Security

"Safety is the top priority."

We protect people, property, and operations with the highest safety standards.

Standards - Innovation - Creativity

"Standards are the foundation, innovation is the driving force."

We adhere to standards and continuously innovate to make a difference.

Connecting global values

"Standards are the foundation, innovation is the driving force."

We adhere to standards and never

stop innovating to make a difference.

Sustainable development

"Connecting to reach greater heights together."

We collaborate and integrate to spread global values.

Strategic location

Phu My Logistics Center, strategically located at the gateway to the expanding Ho Chi Minh City (Southeast region), adjacent to the Cai Mep – Thi Vai deep-water port, Long Thanh International Airport, and Tan Son Nhat Airport, creates a seamless and highly efficient import and export logistics chain. Its integrated green infrastructure, encompassing inland ports and multi-purpose warehouses, optimizes time and cost efficiency, enhancing the sustainable competitiveness of businesses integrating into the international market.

Multimodal transport
Road
Waterways
Air routes
Railway

Road connections

  • 2km – National Highway 51
  • 2km – Cai Mep – Thi Vai Port Complex
  • 28km – Long Thanh International Airport
  • 65km – Ho Chi Minh City Center

Note

  • National highway
  • Belt
  • Highway

Waterway connections

  • 10 km – Cai Mep – Thi Vai Port Complex
  • 75 km – Cat Lai Port

Note

  • Highway
  • Belt
  • Belt

Kết nối đường hàng không

  • 28 km – Sân bay Quốc tế Long Thành (khai thác 2026)
  • 70 km – Sân bay Tân Sơn Nhất (qua
    cao tốc & QL51)

Note

  • Highway
  • National highway

Railway connection

  • 2km – National Highway 51
  • 2km – Cai Mep – Thi Vai Port Complex
  • 28km – Long Thanh International Airport
  • 65km – Ho Chi Minh City Center

Note

  • Belt

Comprehensive, all-inclusive, multimodal logistics services.

PHU MY 3 INTENSIVE INDUSTRIAL PARK

Phu My 3 Intensive Industrial Park is a key Vietnam-Japan cooperation project, the first model intensive industrial park in Vietnam with a scale of nearly 1,000 hectares. Strategically located adjacent to the Cai Mep – Thi Vai deep-water port and boasting international standard infrastructure, Phu My 3 provides comprehensive solutions for logistics and green manufacturing (circular economy). It is also a reliable destination for FDI investors seeking stability, superior incentives, and sustainable development.

Learn more

PORT SERVICES

Phu My Inland Port, located in the heart of the Cai Mep – Thi Vai port cluster, is a strategic link in the Southern region’s logistics supply chain and the global transportation network. With a scale of 38 hectares and 6 modern berths, a smart depot and container yard system, and an advanced transport fleet, we contribute to reducing traffic congestion, cutting emissions, and promoting green and sustainable logistics development.

Learn more

WAREHOUSING SERVICES

The Phu My 3 warehouse complex is being developed on a total area of ​​250,000 m², with 100,000 m² of warehouse space in phase 1 already operational, including CFS warehouses, bonded warehouses, general warehouses, and chemical warehouses, ready to expand by more than 120,000 m² in the 2026–2027 period.

Learn more

CHEMICAL STORAGE TANKS

The chemical storage tanks and industrial gas systems are connected by an underground pipeline system from large-scale hub ports in the area, providing a solution for storing and distributing liquid and gaseous materials to factories in Phu My 3 Intensive Industrial Park and the surrounding area.

Learn more

The certification system meets international standards.

ISO 9001:2015 Quality Management Certificate
ISO 14001:2015 Quality Management Certificate
ISO 45001:2018 Quality Management Certificate
ISO 14064:2025 Quality Management Certificate
CTPAT Certification: US Customs and Trade Partnership Against Terrorism
ISO 9001:2015 Quality Management Certificate
ISO 9001:2015 Quality Management Certificate